Eczpd3xXoAA5Cf0.jpg

Tunnel Repairs in St. Vital 

July 13, 2020

 

 

Work starts today on the $250,000 repairs to the 1965 pedestrian tunnel under Fermor connecting the YMCA-YWCA and the St. Vital library.

Also known as the other tunnel, not the new one near the bridge, this is a long-overdue project that I was proud to get into the budget. (Noise-maker in tunnel was disabled)

https://winnipeg.ctvnews.ca/video?clipId=1994676&binId=1.1164782&playlistPageNum=1&fbclid=IwAR19UHlaTZf4Nzu-9cqGvv3D0E_t5pZDc2Bq_3bs_4g0ajF9ZeQQwFH6FfM